| It is so exciting to see the dirt being moved and the construction of the pool begin. During the excavation process the pool contractor will work closely with the engineering team to determine the finish elevation. Once the dirt have been removed and adjusted to allow for the layout of the pool, the floor profile is shaped and the pool form is constructed. |